Information featured projects that highlight our outstanding record of achievement.
Track Record – Major Projects 1. Offshore Facilities Transportation and Installation Project Name Provision of LB Arwana Satu Kepong – Tiong Pipeline Replacement Project Client PBJV / Petronas Carigali Sdn Bhd Duration 2 months Year March 2008 – May 2008 Project Name Samarang Pipeline Installation Project – Provision of Arwana Satu Pipelay Barge for installation of 4 x 8” pipelines Client TL Offshore / Petronas Carigali Sdn Bhd Duration 3 months Year Sept – Nov 2007 Project Name Offshore Transportation and Installation Works for EPCIC Ledang-Anoa Development Project - Platform & Pipeline Installations and Pre-Commissioning Services Client Malaysia Marine And Heavy Engineering Sdn Bhd / Petronas Carigali Sdn Bhd Duration 120 days Year 2006 Project Name Remedial Work for Damaged 8" & 12" Expansion Spool & PLEM at Penara Field – Pipeline Repair Pipeline Reinstallation/Relocation, Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 120 days Year 2004 2. Pipeline Process & Services Sub-contract Work Project Name Pipeline Pre-commissioning of Natural Gas Pipeline and Metering & Regulating Station to Megasteel Complex Client MMC Engineering Service Sdn Bhd Duration 60 days Year Dec 2007 – March 2008 Project Name Pre-Commissioning Services at PETRONAS Gas Terminal Segamat Client Redsea Engineering (M) Sdn Bhd / PETRONAS Gas Berhad Duration 30 days Year June - July 2007 Project Name Provision of Pipeline Pre-Commissioning Services for Melut Basin, Sudan Client Oilfield Pipeline Inspection Sdn. Bhd. / PECD Construction Sdn. Bhd. / PETRODAR Duration 6 months Year 2006 / 2007 Project Name Pipeline Pre-Commissioning Services for Onshore Domestic Gas Facility Upgrading, Segment 1 & 2, Inside PCL New MOGE Pipeline Project, Myanmar Client KNM Process System Sdn Bhd / TOTAL E&P, Myanmar Duration 60 days Year 2006 Project Name Pipeline Pre-Commissioning for Fairley & Egret Field Development Project Client Weatherford Int / SKS Wood / TL Offshore. / Brunei Shell Production Duration 32 days Year 2005 Project Name Pipeline Pre-Commissioning of Guntong-F Crude & Gas Pipelines Client TL Offshore Sdn. Bhd. / ExxonMobil (EMEPMI) Duration 45 days Year 2005 Project Name Temporary Decommissioning and Pre-Commissioning of Pipelines for Penara Field Expansion Spool & PLEM Remedial Project – Phase III Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 120 days Year 2004 Project Name Decommissioning of Raya-A to Seligi-A Pipeline Pipeline Pre-Commissioning of Raya-A/Raya-B to Seligi-A Replacement Pipelines Client TL Offshore Sdn. Bhd. / ExxonMobil (EMEPMI) Duration 60 days Year 2004 Project Name Pre-Commissioning for the Remedial Work of 8" Damage Pipeline from Penara Platform to PLEM (FPSO) Pigging, Hydrotest, Vacuum Drying & Nitrogen Packing – PHASE II Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 60 days Year 2004 Project Name Pipeline Cleaning, De-oiling & Leak Testing for ERB - WEST Pipeline Repair Project Client Allied Marine & Equipment Sdn. Bhd. / SSB Duration 25 days Year 2004 Project Name Provision of Pre-Commissioning & Commissioning - North Lukut & Penara Pipelines to FPSO Bunga Kertas _ Phase I Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 20 days Year 2003 / 2004 (December / March) Project Name Pipeline Pre-Commissioning and First Oil for ANDP - E & ANDP - C Client Vastalux Sdn. Bhd. / Petronas Carigali Sdn. Bhd. Duration 30 days Year 2003 (December) Project Name Pre-Commissioning of 16” Bakau Pipelines Client Weatherford Kopp GmbH / Horizon Offshore / TL Offshore/PCSB Duration 30 days Year 2003 (November) Project Name Pipeline Pre-Commissioning for AMPA-Fairley Field Development Client Weatherford Kopp GmbH / Horizon Offshore / Brunei Shell Petroleum Duration 160 days Year 2003 (May – August) Project Name Pipeline Pre-Commissioning of 32“ Dia. B11DR-A TO E11R-B Pipeline Client Nippon Steel Construction Malaysia / PCSB Duration 90 days Year 2003 (May – July) Project Name Pipeline Plugging & Temporary Decommissioning of 24“ Dia. ANDR - A to Seligi Pipeline (Pipeline Leak Repair) Client TL Offshore Sdn Bhd/ PCSB Duration 90 days Year 2003 (May – July) Project Name Onshore Johor Pipeline Pre-Commissioning Works of 8" x 20 km & 4" x 4 km Client PCSB / Diversified Engineering Sdn. Bhd. Duration 30 days Year 2002 (November) 3 Leak Test, Bolt Tensioning, Minor Fabrication & Project Consultancy Project Name Bolt Torquing, Flushing and Leak Testing of Abu Cluster Topside Client Ramunia Fabricators Sdn. Bhd. / PCSB Duration 34 days Year May - June 2007 Project Name Provision of Hose Testing and Leak Testing Services for Murphy Sarawak Oil at West Patricia Field Shutdown Project Client Murphy Sarawak Oil. Co. Ltd Duration 20 days Year June 2007 Project Name Piping Reinstatement and Leak Testing – Kikeh SPAR DTU Topsides Client Malaysia Marine & Heavy Engineering Sdn Bhd / Murphy Sabah Oil Co. Ltd. Duration 20 days Year 2006 Project Name Leak Testing Services of Abu-A Cluster Topside Client Ramunia Fabricators Sdn Bhd. / Talisman Malaysia Limited Duration 10 days Year 2006 Project Name Nitrogen Leak Test, Purging, Packing & Reinstatement Services & Bolt Hydraulic Torquing Services - Vietnam Client Prumatech (M) Sdn Bhd. / Talisman Malaysia Limited Duration 20 days Year 2006/2007 Project Name Provision of Bolt Torquing and Nitrogen/Helium Leak Testing for South Angsi A (SAA) Naga Kecil Development Project Client EJ Joint Venture Sdn Bhd. / Talisman Malaysia Limited Duration 20 days Year 2006 Project Name Provision of Leak Testing Services for West Patricia Development Project Client Murphy Sarawak Oil Duration 14 days Year 2005 Project Name Provision of Hydrotesting and Leak Testing Services for Bunga Raya Field Development Client Ramunia Fabricators / Talisman Malaysia Ltd. Duration 90 days Year 2005 - 2006 Project Name Fabrication of Riser Clamp for Baram Pipeline Replacement Project Client Allied Marine & Equipment Sdn Bhd / Petronas Carigali Sdn Bhd Year 2005 - 2006 Project Name Provision of Hydrotesting and Leak Testing Services for Bunga Raya Field Development. Client Haven Engineering Sdn Bhd / Talisman Malaysia Ltd. Duration 90 days Year 2004 – 2005 Project Name Supply Manpower, Equipment and Consumables for Blasting and Painting (Glass Flake Coat) for North Lukut & Penara-A Project Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 60 days Year 2004 Project Name Fabrication & Rubber Coating for 33 nos. of Riser Clamp for Baram Fairley Project 2004 and BaJT – D to BaDP - B Pipeling Replacement Project including Packaging and Sea fastening Client Malaysia Shipyard and Engineering Sdn. Bhd. Duration 60 days Year 2004 |